A static cabinet needs a level floor and a wall. Compact shelving needs a surveyed floor, a track installed to tolerance, and a room that can be emptied for a week. Plan those three and the installation is uneventful.
1. Floor survey
The track must be level within a few millimetres over its whole run. Measure with a laser level at several points, not with a spirit level at one. A floor that looks flat often falls 10 mm towards a drain.
Record the result. If the fall is outside tolerance, the options are a self-levelling screed or a shimmed track base, and both need to be priced before the order is confirmed.
2. Structural check
Loaded bays are heavy, and the track concentrates that load into narrow strips. For upper floors, or buildings older than the laboratory, have a structural engineer check the slab against the loaded weight.
Give the engineer the bay count, the drawer content (blocks or slides) and the track layout. "A few cabinets" is not enough information for a structural opinion.
3. Delivery route
Bays arrive assembled or in large sections. Check door widths, lift capacity, corridor turns and any step at the entrance. A route survey takes twenty minutes and prevents a crane hire.
4. Power and data
A manual system needs no power, which is one reason it is popular in older buildings. A motorised system needs a supply at the end of the run and a control point per aisle. Either way, plan a data outlet for the archive index near the filing position.
5. Safety devices
- Anti-tip devices on each bay
- Drawer fall-arrest stops
- Buffer seals between bays
- A clear exit path that does not depend on moving a bay
- Operating instructions posted at the first bay
Check each of these at handover, not from the quotation.
6. Moving the archive
Move material in accession order and keep the old location recorded until the new one is verified. A two-person check — one reading, one filing — catches most errors before they become permanent.
Do not fill the new system to capacity on day one. Leave the last bay empty so the next year's cases have somewhere to go while staff learn the new layout.
Handover checklist
- Track level recorded and signed off
- Bay travel smooth under full load
- Handwheel force measured at rated load
- Anti-tip and fall-arrest tested
- Spare parts list and runner part numbers received
- Staff trained on one-drawer-at-a-time rule
If all six are complete, the system is ready. If the handwheel needs two people, the track or the drive is wrong, and it will not improve with use.
Common questions
How long does installation take?
For a four-bay system, typically two to four days including track fixing, depending on the floor condition.
Can we install in stages?
Yes, if the track is laid for the full run at the start. Adding track later means emptying the room again.
Need this applied to your own archive? Send annual block or slide counts and the retention period, and we will return a capacity calculation with a suggested cabinet layout. Request a quote.